Resource was hired by Carter Woods Assisted Living facility to prepare the site plans for both phases of the 100-unit building and 118 space parking lot.
Update March 2018
Construction is coming to an end at Doswell Limited Partnership. Electric generating turbines has been installed and their housing structures have them completely enclosed. Control rooms, transformers and switch assemblies have been installed. High wire support towers are standing and have been connected into the electric grid. The buzz of electricity can be heard. The twin exhaust stacks have been completed. Construction crews continue with fine details of equipment installation and calibration. The perimeter road installation has begun. Equipment testing will begin in a few weeks.